17 de juny del 2010

Document de la Unesco demanant posar sensors a les esquerdes (craks) de la Sagrada Família durant 3 mesos, ABANS del pas de la tuneladora



                Barcelona, den 19/06/2010
                               C:\Daten\Sagrada Familia\Ortstermin Bu 7.-9.4\10-04-07-meeting soldata & sacyr.doc
Memo
Concerning the aims of the envisaged crack monitoring in the Sagrada Familia
Date: 08th of June 2010 in Barcelona in the Church of the Sagrada Familia
Participating persons:        Mr. Bonet
                                               Mr. Buxaude
                                               Mr. Fauli
                                               Mr. Fuchs
                                               Mr. Burkert

Aims of crack monitoring:

1.    Definition:
       The crack monitoring is part of a general supervision that consists of two parts: One is the measuring of deformations of surfaces of building members. This measurement is already in process and being done by SolData with so called cyclops that conduct automized tachymetric measurements of inner and outer surfaces of the Glory façade as well as the adjacent naves on the west and east. The second part is the monitoring of structurally relevant cracks in the Glory façade and the adjacent lateral naves. This text refers to the second part of the general monitoring of the church.

2.    Content:
       The crack monitoring aims at a constant observation of structurally relevant cracks with crack monitors. At the same time external influences are being recorded that might have an impact on the behaviour of the construction and the cracks.
       These external influences are:
       Air temperature
       Humidity (and rainfall, duration of rainfall and quantity)
       Wind direction and wind intensity
       Air pressure
       Major events in the building
       Execution of works that might cause additional vibrations

3.    Expected results:
       After having gained information on the correlation between the mentioned external influences and possible movements within the cracks it is possible to judge abnormal behaviour of the cracks when the TBM (Tunnel boring machine) passes the Glory facade.

4.    Optimal starting time of measurements:
       Possible changes or movements within the cracks can be judged much better and much more reliable if the building members have been observed for a sufficient amount of time before the TBM passes the building. This period of time must not be less than 3 months.
       In a period of three months different cases of weathering and their influence on the cracks can be studied relatively precise. In case of changes in the crack behaviour at the time the TBM is passing the building, it is possible to define whether these changes are related to the activity of the TBM or to other external factors.

Dr.-Ing. Toralf Burkert
Barcelona, 08.06.2010